Scottish Power · EV charging site
The Avenue Car Park
The Avenue, Garelochhead, PA32 8YX
The Avenue Car Park is an EV charging site in Garelochhead, Argyll and Bute, run by Scottish Power. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as £0.70 per kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Inveraray: Avenue Car Park (Chargeplace Scotland), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Scottish Power
- Opening hours
- Not published
- Access
- Public
- Price
- £0.70 per kWh(from Open Charge Map, 30 Oct 2026)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Avenue Car Park (Scottish Power)?
The listed price is £0.70 per kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Avenue Car Park (Scottish Power)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does The Avenue Car Park (Scottish Power) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
Who operates The Avenue Car Park?
The Avenue Car Park is on the Scottish Power network.
Where is the nearest other charger with 50 kW or more to The Avenue Car Park (Scottish Power)?
Inveraray: Avenue Car Park (Chargeplace Scotland) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Avenue Car Park (Scottish Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Avenue Car Park (Scottish Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Avenue Car Park (Scottish Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.