# The Avenue Car Park · Scottish Power

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-the-avenue-car-park-uk

The Avenue Car Park is an EV charging site in Garelochhead, Argyll and Bute, run by Scottish Power. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as £0.70 per kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** The Avenue, PA32 8YX
- **Area:** Garelochhead, Argyll and Bute, United Kingdom
- **Coordinates (latitude, longitude):** 56.23027, -5.07449

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.70 per kWh (from Open Charge Map)

## Site information

- **Operator:** Scottish Power
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at The Avenue Car Park (Scottish Power)?

The listed price is £0.70 per kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Avenue Car Park (Scottish Power)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does The Avenue Car Park (Scottish Power) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates The Avenue Car Park?

The Avenue Car Park is on the Scottish Power network.

### How long does a Tesla Model Y Long Range take to charge at The Avenue Car Park (Scottish Power)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Avenue Car Park (Scottish Power)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Avenue Car Park (Scottish Power)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Garelochhead](https://ampmap.co.uk/chargers/united-kingdom/argyll-and-bute/garelochhead)
- [Scottish Power chargers](https://ampmap.co.uk/networks/scottish-power)

## Chargers near this site

- [Inveraray: Avenue Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-inveraray-avenue-car-park-uk) - CHAdeMO 50 kW, Type 2 50 kW · 2 Main Street South

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-the-avenue-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Oct 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
