# The Knowes Car Park, Kelso · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-the-knowes-car-park-kelso-uk

The Knowes Car Park, Kelso is an EV charging site in Kelso, The Scottish Borders, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** The Knowes Car Park, TD5 7BH
- **Area:** Kelso, The Scottish Borders, United Kingdom
- **Coordinates (latitude, longitude):** 55.59719, -2.43057

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at The Knowes Car Park, Kelso (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Knowes Car Park, Kelso (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does The Knowes Car Park, Kelso (Chargeplace Scotland) have?

1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates The Knowes Car Park, Kelso?

The Knowes Car Park, Kelso is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at The Knowes Car Park, Kelso (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Knowes Car Park, Kelso (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Knowes Car Park, Kelso (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kelso](https://ampmap.co.uk/chargers/united-kingdom/the-scottish-borders/kelso)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Galedin Vetinary · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-galedin-vetinary-uk) - Type 2 22 kW · Maxwell Lane
- [Kelso Town Hall, Kelso Square, Kelso · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kelso-town-hall-kelso-square-kelso-uk) - Type 2 7 kW · Kelso Square
- [Social Works Dept · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-social-works-dept-uk) - BS1363 3 Pin 13 Amp 3 kW · Rose Lane
- [Kelso Hospital · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kelso-hospital-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Inch Road
- [Merlin Vet Group - Kelso · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-merlin-vet-group-kelso-uk) - Type 2 22 kW · Edinburgh Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-the-knowes-car-park-kelso-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 31 May 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
