Chargeplace Scotland · EV charging site
The Pier Gourock
Station Road, Greenock, PA19 1QR
The Pier Gourock is an EV charging site in Greenock, Inverclyde, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Kempock Street Car Park (Chargeplace Scotland), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 4 Feb 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Pier Gourock (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at The Pier Gourock (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Pier Gourock (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates The Pier Gourock?
The Pier Gourock is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to The Pier Gourock (Chargeplace Scotland)?
Kempock Street Car Park (Chargeplace Scotland) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Pier Gourock (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Pier Gourock (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Pier Gourock (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Station Road, Gourock
- Kempock Street Car Park
- Gourock - Lower Kempock Street
- Battery Park, Greenock
- Branchton SF Connect
- West College Scotland, Greenock Campus, Greenock
- Fastest nearby
- Branchton SF Connect · 150 kW · 1.7 mi