# The Torridon, Wester Ross · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-the-torridon-wester-ross-uk

The Torridon, Wester Ross is an EV charging site in Wester Ross, Highland, run by Chargeplace Scotland. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** The Torridon, IV22 2EY
- **Area:** Wester Ross, Highland, United Kingdom
- **Coordinates (latitude, longitude):** 57.52819, -5.52656

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at The Torridon, Wester Ross (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Torridon, Wester Ross (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does The Torridon, Wester Ross (Chargeplace Scotland) have?

1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates The Torridon, Wester Ross?

The Torridon, Wester Ross is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at The Torridon, Wester Ross (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Torridon, Wester Ross (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Torridon, Wester Ross (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wester Ross](https://ampmap.co.uk/chargers/united-kingdom/highland/wester-ross)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-the-torridon-wester-ross-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 26 Mar 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
