# Tomatin Distillery · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-tomatin-distillery-uk

Tomatin Distillery is an EV charging site in Inverness, Highland, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Allt Dubhag Road, IV13 7YT
- **Area:** Inverness, Highland, United Kingdom
- **Coordinates (latitude, longitude):** 57.34146, -4.01038
- **Getting there:** Charge point is 1 km from Tomatin Distillery/visitor centre. Turn off A9. 300m after turning off the A9, turn right into Tomatin distillery & continue along this road. Go under a railway bridge and then cross a bridge over a stream. Take the right immediately after the bridge over the stream. The charge point is behind the building on your left.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.15/kWh;min £1.00 (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Tomatin Distillery (Chargeplace Scotland)?

The listed price is £0.15/kWh;min £1.00. Prices can change, so check the price at the charger before you start.

### How fast is charging at Tomatin Distillery (Chargeplace Scotland)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Tomatin Distillery (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates Tomatin Distillery?

Tomatin Distillery is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Tomatin Distillery (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tomatin Distillery (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tomatin Distillery (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Inverness](https://ampmap.co.uk/chargers/united-kingdom/highland/inverness)
- [Cheapest charging in Inverness](https://ampmap.co.uk/chargers/united-kingdom/highland/inverness/cheapest)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Strathdearn Community Centre, Tomatin · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-strathdearn-community-centre-tomatin-uk) - CCS 50 kW, CHAdeMO 50 kW · Strathdearn Community Centre, Tomatin
- [The Strathdearn Hub · POGO](https://ampmap.co.uk/charger/pogo-the-strathdearn-hub-uk) - CCS 100 kW, Type 2 22 kW · Strathdearn · From 56p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-tomatin-distillery-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 13 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
