Chargeplace Scotland · EV charging site
Townhead Street Car Park, Cumnock
Townhead Street Car Park, Cumnock, KA18 1LY
Townhead Street Car Park, Cumnock is an EV charging site in Cumnock, East Ayrshire, run by Chargeplace Scotland. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Millbank, Cumnock (Chargeplace Scotland), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 13 May 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Townhead Street Car Park, Cumnock (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Townhead Street Car Park, Cumnock (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Townhead Street Car Park, Cumnock (Chargeplace Scotland) have?
6 charging sockets: 6 × 7 kW Type 2.
Who operates Townhead Street Car Park, Cumnock?
Townhead Street Car Park, Cumnock is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Townhead Street Car Park, Cumnock (Chargeplace Scotland)?
Millbank, Cumnock (Chargeplace Scotland) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Townhead Street Car Park, Cumnock (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Townhead Street Car Park, Cumnock (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Townhead Street Car Park, Cumnock (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Glaisnock Street, Cumnock
- Rothesay House, Cumnock
- Millbank, Cumnock
- Tanyard Car Park, Cumnock
- Cumnock Kerr&Smith 2
- Netherthird Community Centre
- Fastest nearby
- Millbank, Cumnock · 50 kW · 0.2 mi