# Tweedbank Railway Station · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-tweedbank-railway-station-uk

Tweedbank Railway Station is an EV charging site in Tweedbank, The Scottish Borders, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Tweedbank Drive, TD1 3SP
- **Area:** Tweedbank, The Scottish Borders, United Kingdom
- **Coordinates (latitude, longitude):** 55.60602, -2.75896

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Tweedbank Railway Station (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Tweedbank Railway Station (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Tweedbank Railway Station (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Tweedbank Railway Station?

Tweedbank Railway Station is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Tweedbank Railway Station (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tweedbank Railway Station (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tweedbank Railway Station (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Tweedbank](https://ampmap.co.uk/chargers/united-kingdom/the-scottish-borders/tweedbank)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Tweedbank Station · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-tweedbank-station-uk) - Type 2 7 kW · 3 Tweedbank Avenue
- [Scottish Public Pensions Agency (SPPA) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-scottish-public-pensions-agency-sppa-uk) - CCS 50 kW, CHAdeMO 50 kW · 7 Tweedside Park
- [MFG Tweedbank · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-tweedbank-uk) - CCS 150 kW, CHAdeMO 50 kW · Gateway Drive
- [Scottish Government, Galashiels · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-scottish-government-galashiels-uk) - Type 2 7 kW · 24 Cotgreen Road
- [Merlin Vet Group · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-merlin-vet-group-uk) - Type 2 7 kW · Unit 1, Easter Langlee Industrial Estate
- [Buccleuch Street Car Park, Melrose · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-buccleuch-street-car-park-melrose-uk) - CCS 50 kW, CHAdeMO 50 kW · Buccleuch Street Car Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-tweedbank-railway-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 Apr 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
