# Ullapool Harbour · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-ullapool-harbour-uk

Ullapool Harbour is an EV charging site in Ullapool, Highland, run by Chargeplace Scotland. Both of its sockets are 100 kW CCS, and the price is listed as 75p/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** The Pier, IV26 2UH
- **Area:** Ullapool, Highland, United Kingdom
- **Coordinates (latitude, longitude):** 57.89557, -5.16136

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 100 kW | 2 | Not listed |

- **Price:** 75p/kWh (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Ullapool Harbour (Chargeplace Scotland)?

The listed price is 75p/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Ullapool Harbour (Chargeplace Scotland)?

Up to 100 kW DC via CCS.

### How many charging sockets does Ullapool Harbour (Chargeplace Scotland) have?

2 charging sockets: 2 × 100 kW CCS.

### Who operates Ullapool Harbour?

Ullapool Harbour is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Ullapool Harbour (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ullapool Harbour (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ullapool Harbour (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ullapool](https://ampmap.co.uk/chargers/united-kingdom/highland/ullapool)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Ullapool Ferry Terminal - 0278 · FOR EV](https://ampmap.co.uk/charger/for-ev-ullapool-ferry-terminal-0278-uk) - CCS 100 kW · West Shore Road · From 70p/kWh
- [Rawowned Caledonian 3 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-rawowned-caledonian-3-uk) - Type 2 22 kW · The Caledonian Hotel Quay Street
- [Pod Point Tesco Superstore - Ullapool](https://ampmap.co.uk/charger/pod-point-tesco-superstore-ullapool-uk) - Type 2 7 kW · Latheron lane · From 44.4p/kWh
- [Latheron Lane Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-latheron-lane-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Latheron Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-ullapool-harbour-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Nov 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
