# Ulsta Shetland Ferry Terminal, Yell · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-ulsta-shetland-ferry-terminal-yell-uk

Ulsta Shetland Ferry Terminal, Yell is an EV charging site in Lerwick, Shetland Islands, run by Chargeplace Scotland. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Ulsta Shetland Ferry Terminal, Yell, ZE2 9BD
- **Area:** Lerwick, Shetland Islands, United Kingdom
- **Coordinates (latitude, longitude):** 60.49665, -1.15991

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland) have?

1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Ulsta Shetland Ferry Terminal, Yell?

Ulsta Shetland Ferry Terminal, Yell is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lerwick](https://ampmap.co.uk/chargers/united-kingdom/shetland-islands/lerwick)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-ulsta-shetland-ferry-terminal-yell-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
