Chargeplace Scotland · EV charging site
Vistor Centre
Vistor Centre, Sangomor
Vistor Centre is a planned EV charging site in Sangomor, Highland, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Durness (Chargeplace Scotland), 0.3 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Price
- £0.30/kWh; minimum fee £1.00(from Open Charge Map, 31 May 2021)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Vistor Centre (Chargeplace Scotland)?
The listed price is £0.30/kWh; minimum fee £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Vistor Centre (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Vistor Centre (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Vistor Centre?
Vistor Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Vistor Centre (Chargeplace Scotland)?
Durness (Chargeplace Scotland) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Vistor Centre (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Vistor Centre (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Vistor Centre (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.