# Western Isles Hospital, Stornoway · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-western-isles-hospital-stornoway-uk

Western Isles Hospital, Stornoway is an EV charging site in Isle of Lewis, Eilean Siar, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Western Isles Hospital, Stornoway, HS1 2AF
- **Area:** Isle of Lewis, Eilean Siar, United Kingdom
- **Coordinates (latitude, longitude):** 58.22045, -6.38192

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Western Isles Hospital, Stornoway (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Western Isles Hospital, Stornoway (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Western Isles Hospital, Stornoway (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Western Isles Hospital, Stornoway?

Western Isles Hospital, Stornoway is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Western Isles Hospital, Stornoway (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Western Isles Hospital, Stornoway (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Western Isles Hospital, Stornoway (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Isle of Lewis](https://ampmap.co.uk/chargers/united-kingdom/eilean-siar/isle-of-lewis)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [South Beach Health Board Office · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-south-beach-health-board-office-uk) - Type 2 22 kW · 11 Napier Hill
- [Lews Castle College · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-lews-castle-college-uk) - Type 2 7 kW · Willowglen Road
- [Council Offices, Stornoway · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-council-offices-stornoway-uk) - CCS 50 kW, CHAdeMO 50 kW · Sandwick Road
- [Nhs Western Isles, Health Board Office, Stornoway · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-nhs-western-isles-health-board-office-stornoway-uk) - Type 2 22 kW · Nhs Western Isles, Health Board Office, Stornoway
- [Shell Street Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-shell-street-car-park-uk) - CHAdeMO 50 kW, Type 2 43 kW · Stornoway Port Authority
- [Pod Point Tesco Superstore - Stornoway](https://ampmap.co.uk/charger/pod-point-tesco-superstore-stornoway-uk) - Type 2 7 kW · Ferry Road · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-western-isles-hospital-stornoway-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
