Chargeplace Scotland · EV charging site
Whitburn Swimming Pool
101 West Main Street, Bathgate, EH47 0QE
Whitburn Swimming Pool is an EV charging site at 101 West Main Street in Bathgate, West Lothian, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 1 other charge point named Whitburn Swimming Pool in Bathgate. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Whitburn Swimming Pool (Chargeplace Scotland), 110 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Whitburn Swimming Pool (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Whitburn Swimming Pool (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Whitburn Swimming Pool?
Whitburn Swimming Pool is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Whitburn Swimming Pool (Chargeplace Scotland)?
Whitburn Swimming Pool (Chargeplace Scotland) is 110 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Whitburn Swimming Pool (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Whitburn Swimming Pool (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Whitburn Swimming Pool (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Whitburn Swimming Pool
- Best Western Hotel, Hilcroft
- EG Group Hartlands 1
- Heartlands, UK
- Polkemmet Country Park
- Armadale Station, Armadale
- Cheapest nearby
- Heartlands, UK · 65p per kWh · 250 kW · 0.8 mi
- Fastest nearby
- Heartlands, UK · 250 kW · 0.8 mi