ChargePoint · EV charging site
Catalyst (Front)
Innovation Centre, Belfast, BT3 9DT
Catalyst (Front) is an EV charging site at Innovation Centre in Belfast, City of Belfast, run by ChargePoint. All 6 of its sockets are 22 kW Type 2. Amp Map lists 1 other charge point named Catalyst (Front) in Belfast. 15 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Porsche (Porsche Smart Mobility GmbH), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Catalyst (Front) (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Catalyst (Front) (ChargePoint) have?
6 charging sockets: 6 × 22 kW Type 2.
Who operates Catalyst (Front)?
Catalyst (Front) is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to Catalyst (Front) (ChargePoint)?
Porsche (Porsche Smart Mobility GmbH) is 0.6 miles away in a straight line, with up to 320 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Catalyst (Front) (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Catalyst (Front) (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Catalyst (Front) (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Catalyst (Rear)
- Catalyst (Front)
- Titanic Quarter Carpark B
- Titanic Visitors Centre
- Aloft & Residence Inn
- Porsche
- Fastest nearby
- Porsche · 320 kW · 0.6 mi