Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ChargePoint · EV charging site

EG Group Chorley Sbx

Starbucks, Chorley, PR7 1PW

EG Group Chorley Sbx is an EV charging site in Chorley, Lancashire, run by ChargePoint. It has a single 150 kW Type 2 socket. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Market Street Chorley (BP Pulse), 0.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Dec 2023Last verified 7 Dec 2023

Connectors

Type 2 · 150 kW1 connector

Site information

Operator
ChargePoint
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
1-408-841-4500

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW Type 2~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW Type 2~24 min
Audi Q4 e-tron 50 10–80% · 150 kW Type 2~39 min
Hyundai IONIQ 5 10–80% · 150 kW Type 2~23 min
MG Motor MG4 Trophy 10–80% · 150 kW Type 2~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW Type 2~39 min
Nissan LEAF 10–80% · 150 kW Type 2~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at EG Group Chorley Sbx (ChargePoint)?

Up to 150 kW DC via Type 2.

How many charging sockets does EG Group Chorley Sbx (ChargePoint) have?

1 charging socket: 1 × 150 kW Type 2.

Who operates EG Group Chorley Sbx?

EG Group Chorley Sbx is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

Where is the nearest other charger with 50 kW or more to EG Group Chorley Sbx (ChargePoint)?

Market Street Chorley (BP Pulse) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EG Group Chorley Sbx (ChargePoint)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Chorley Sbx (ChargePoint)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EG Group Chorley Sbx (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Dec 2023

Amp Map does not take payment. You pay the operator.