ChargePoint · EV charging site
EG Group Neath 1
2 Empire Avenue, Aberdare, SA11 5ST
EG Group Neath 1 is an EV charging site in Aberdare, Rhondda Cynon Taf, run by ChargePoint. Its 4 sockets reach up to 175 kW, with Type 2 at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is McDonald's Glynneath (InstaVolt Ltd), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EG Group Neath 1 (ChargePoint)?
Up to 175 kW DC via CHAdeMO, Type 2.
How many charging sockets does EG Group Neath 1 (ChargePoint) have?
4 charging sockets: 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2, 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2.
Who operates EG Group Neath 1?
EG Group Neath 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to EG Group Neath 1 (ChargePoint)?
McDonald's Glynneath (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Group Neath 1 (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 175 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Neath 1 (ChargePoint)?
A typical 10–80% rapid charge takes about 23 min on the 175 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Group Neath 1 (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 175 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.