ChargePoint · EV charging site
EG Group Waterside HQ 4
EG Group Waterside Head Office, Blackburn, BB1 2FA
EG Group Waterside HQ 4 is an EV charging site at EG Group Waterside Head Office in Blackburn, Blackburn with Darwen, run by ChargePoint. Both of its sockets are 50 kW CHAdeMO and Type 2. Amp Map lists 1 other charge point named EG Group Waterside HQ 4 in Blackburn. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EG GROUP BEEHIVE 1 (ChargePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EG Group Waterside HQ 4 (ChargePoint)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does EG Group Waterside HQ 4 (ChargePoint) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates EG Group Waterside HQ 4?
EG Group Waterside HQ 4 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to EG Group Waterside HQ 4 (ChargePoint)?
EG GROUP BEEHIVE 1 (ChargePoint) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Group Waterside HQ 4 (ChargePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Waterside HQ 4 (ChargePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Group Waterside HQ 4 (ChargePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- EG Group Waterside HQ 1
- EG Group Waterside HQ 4
- EG Group Beehive 1
- Willows, Blackburn
- Shell Recharge Shell Grimshaw Park
- Pod Point Tesco Superstore - Blackburn
- Cheapest nearby
- Pod Point Tesco Superstore - Blackburn · 44.4p per kWh · 7 kW · 1.3 mi
- Fastest nearby
- Shell Recharge Shell Grimshaw Park · 400 kW · 1 mi