ChargePoint · EV charging site
EV Point, Baynards Green
B4100, Bicester, OX27 7SG
EV Point, Baynards Green is an EV charging site in Bicester, Oxfordshire, run by ChargePoint. All 4 of its sockets are 150 kW CCS, and the price is listed as £0.65/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonald's Baynards Green (InstaVolt Ltd), 80 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.65/kWh(from Open Charge Map, 9 Sept 2024)
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EV Point, Baynards Green (ChargePoint)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EV Point, Baynards Green (ChargePoint)?
Up to 150 kW DC via CCS.
How many charging sockets does EV Point, Baynards Green (ChargePoint) have?
4 charging sockets: 1 × 150 kW CCS, 1 × 150 kW CCS, 1 × 150 kW CCS, 1 × 150 kW CCS.
Who operates EV Point, Baynards Green?
EV Point, Baynards Green is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to EV Point, Baynards Green (ChargePoint)?
McDonald's Baynards Green (InstaVolt Ltd) is 80 yards away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EV Point, Baynards Green (ChargePoint)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EV Point, Baynards Green (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EV Point, Baynards Green (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- McDonald's Baynards Green
- EH - MOTO Cherwell Valley
- Cherwell Valley Moto M40 Services Nomadpower
- zest-year-help-word
- Holm Square - Bicester
- Motosport UK
- Cheapest nearby
- EH - MOTO Cherwell Valley · 59p per kWh · 175 kW · 0.7 mi
- Fastest nearby
- Holm Square - Bicester · 200 kW · 3.9 mi