ChargePoint · EV charging site
Kennington Park Business Centre
1 Brixton Road, SW9 6DE
Kennington Park Business Centre is an EV charging site in Brixton, Greater London, run by ChargePoint. All 4 of its sockets are 7 kW Type 2. 197 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 2-12 Windmill Row, Kennington, 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 1-408-841-4500
- Notes
- Access via Cranmer Road. Pay with the Pod-Point app. Paid parking, check the signage.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Kennington Park Business Centre (ChargePoint)?
Up to 7 kW AC via Type 2.
How many charging sockets does Kennington Park Business Centre (ChargePoint) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Kennington Park Business Centre?
Kennington Park Business Centre is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Can anyone charge at Kennington Park Business Centre (ChargePoint)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Kennington Park Business Centre (ChargePoint)?
2-12 Windmill Row, Kennington is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kennington Park Business Centre (ChargePoint)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kennington Park Business Centre (ChargePoint)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kennington Park Business Centre (ChargePoint)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Workspace - Kennington Park
- Kennington Park Gardens
- Conant House
- 1-24 Rutley Close
- ubitricity Distributed Energy Systems UK Ltd. 65 Hillingdon Street, outside of Prescott Hou
- 405 Kennington Station 2
- Cheapest nearby
- Pod Point Workspace - Kennington Park · 27.6p per kWh · 7 kW · 10 yd
- Fastest nearby
- 405 Kennington Station 2 · 22 kW · 0.3 mi