ChargePoint · EV charging site
Lister Hospital Hsp Station 1
Coreys Mill Lane, Stevenage, SG1 4AB
Lister Hospital Hsp Station 1 is an EV charging site in Stevenage, Hertfordshire, run by ChargePoint. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - Stevenage, 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lister Hospital Hsp Station 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Lister Hospital Hsp Station 1 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Lister Hospital Hsp Station 1?
Lister Hospital Hsp Station 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to Lister Hospital Hsp Station 1 (ChargePoint)?
Pod Point Tesco Extra - Stevenage is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lister Hospital Hsp Station 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lister Hospital Hsp Station 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lister Hospital Hsp Station 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lytton Way MSCP, Stevenage 7
- Pod Point Tesco Extra - Stevenage
- Lytton Way MSCP, Stevenage 12
- Marshgate Car Park, Stevenage 2
- Swingate, Stevenage 02
- St Georges Way MSCP North Level Four 2
- Cheapest nearby
- Pod Point Tesco Extra - Stevenage · 44.4p per kWh · 50 kW · 1.4 mi
- Fastest nearby
- Pod Point Tesco Extra - Stevenage · 50 kW · 1.4 mi