ChargePoint · EV charging site
Mtp Horiba NW03 -02
Mira Drive, Nuneaton, CV10 0TU
Mtp Horiba NW03 -02 is an EV charging site in Nuneaton, Warwickshire, run by ChargePoint. It has a single 22 kW Type 2 socket. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Waddington (GeniePoint), 1.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mtp Horiba NW03 -02 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Mtp Horiba NW03 -02 (ChargePoint) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Mtp Horiba NW03 -02?
Mtp Horiba NW03 -02 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to Mtp Horiba NW03 -02 (ChargePoint)?
Shell Waddington (GeniePoint) is 1.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mtp Horiba NW03 -02 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mtp Horiba NW03 -02 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mtp Horiba NW03 -02 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point MIRA Technology Ltd
- Mtp Mira Drive 01
- Shell Waddington
- Acorn, Nuneaton
- McDonald's
- Triumph Motorcylces
- Cheapest nearby
- Pod Point MIRA Technology Ltd · 45.6p per kWh · 22 kW · 0.1 mi
- Fastest nearby
- McDonald's · 120 kW · 2.5 mi