ChargePoint · EV charging site
NT Stourhead Estate
High Street, Frome, BA12 6QD
NT Stourhead Estate is an EV charging site in Frome, Somerset, run by ChargePoint. Its 16 sockets reach up to 300 kW, with CCS at the top speed. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Hunters Lodge Inn (POGO), 3.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- AC: £0.60/kWh; DC: £0.75/kWh; other tariffs available. Parking fees apply to non-NT members.(from Open Charge Map, 8 May 2025)
- Phone (from Open Charge Map)
- 1-408-841-4500
- Notes
- Branded as RAW charging
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at NT Stourhead Estate (ChargePoint)?
The listed price is AC: £0.60/kWh; DC: £0.75/kWh; other tariffs available. Parking fees apply to non-NT members.. Prices can change, so check the price at the charger before you start.
How fast is charging at NT Stourhead Estate (ChargePoint)?
Up to 300 kW DC via CCS, Type 2.
How many charging sockets does NT Stourhead Estate (ChargePoint) have?
16 charging sockets: 4 × 300 kW CCS, 4 × 150 kW CCS, 8 × 22 kW Type 2.
Who operates NT Stourhead Estate?
NT Stourhead Estate is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to NT Stourhead Estate (ChargePoint)?
Hunters Lodge Inn (POGO) is 3.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at NT Stourhead Estate (ChargePoint)?
A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NT Stourhead Estate (ChargePoint)?
A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at NT Stourhead Estate (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Visit Hillbrush · Free · 22 kW · 1.6 mi