# NT Stourhead Estate · ChargePoint

Web page: https://ampmap.co.uk/charger/chargepoint-nt-stourhead-estate-uk

NT Stourhead Estate is an EV charging site in Frome, Somerset, run by ChargePoint. Its 16 sockets reach up to 300 kW, with CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** High Street, BA12 6QD
- **Area:** Frome, Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 51.10433, -2.31698

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 300 kW | 4 | Not listed |
| CCS | 150 kW | 4 | Not listed |
| Type 2 | 22 kW | 8 | Not listed |

- **Price:** AC: £0.60/kWh; DC: £0.75/kWh; other tariffs available. Parking fees apply to non-NT members. (from Open Charge Map)

## Site information

- **Operator:** ChargePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Branded as RAW charging

## Common questions

### How much does it cost to charge at NT Stourhead Estate (ChargePoint)?

The listed price is AC: £0.60/kWh; DC: £0.75/kWh; other tariffs available. Parking fees apply to non-NT members.. Prices can change, so check the price at the charger before you start.

### How fast is charging at NT Stourhead Estate (ChargePoint)?

Up to 300 kW DC via CCS, Type 2.

### How many charging sockets does NT Stourhead Estate (ChargePoint) have?

16 charging sockets: 4 × 300 kW CCS, 4 × 150 kW CCS, 8 × 22 kW Type 2.

### Who operates NT Stourhead Estate?

NT Stourhead Estate is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

### How long does a Tesla Model Y Long Range take to charge at NT Stourhead Estate (ChargePoint)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NT Stourhead Estate (ChargePoint)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at NT Stourhead Estate (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Frome](https://ampmap.co.uk/chargers/united-kingdom/somerset/frome)
- [ChargePoint chargers](https://ampmap.co.uk/networks/chargepoint)

## Chargers near this site

- [Pod Point The Bell and Crown](https://ampmap.co.uk/charger/pod-point-the-bell-and-crown-uk) - Type 2 7 kW · New Road Zeals · From 88.8p/kWh
- [Pod Point Visit Hillbrush](https://ampmap.co.uk/charger/pod-point-visit-hillbrush-cafe-and-visitor-centre-uk) - Type 2 22 kW · Castle Street Norwood Park · Free to use
- [Hunters Lodge Inn · POGO](https://ampmap.co.uk/charger/pogo-charge-hunter-s-lodge-inn-uk) - CCS 50 kW, CHAdeMO 50 kW · Leigh Common · From 56p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargepoint-nt-stourhead-estate-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 May 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
