# RAW Charging Yard, The Urban Building · ChargePoint

Web page: https://ampmap.co.uk/charger/chargepoint-raw-charging-yard-the-urban-building-uk

RAW Charging Yard, The Urban Building is an EV charging site in Slough, run by ChargePoint. Its 4 sockets reach up to 350 kW, with CCS at the top speed, and the price is listed as £0.57/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Albert Street, SL1 1EL
- **Area:** Slough, United Kingdom
- **Coordinates (latitude, longitude):** 51.50624, -0.59743

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 350 kW | 4 | Not listed |
| CCS | 150 kW | 4 | Not listed |
| CHAdeMO | 100 kW | 2 | Not listed |
| Type 2 | 22 kW | 4 | Not listed |

- **Price:** £0.57/kWh (from Open Charge Map)

## Site information

- **Operator:** ChargePoint
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

The listed price is £0.57/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at RAW Charging Yard, The Urban Building (ChargePoint)?

Up to 350 kW DC via Type 2, CCS, CHAdeMO.

### How many charging sockets does RAW Charging Yard, The Urban Building (ChargePoint) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 350 kW CCS, 2 × 350 kW CCS, 1 × 100 kW CHAdeMO, 2 × 150 kW CCS, 1 × 100 kW CHAdeMO, 2 × 150 kW CCS.

### Who operates RAW Charging Yard, The Urban Building?

RAW Charging Yard, The Urban Building is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

### How long does a Tesla Model Y Long Range take to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Slough](https://ampmap.co.uk/chargers/united-kingdom/slough/slough)
- [ChargePoint chargers](https://ampmap.co.uk/networks/chargepoint)

## Chargers near this site

- [25 Windsor Road](https://ampmap.co.uk/charger/25-windsor-road-uk) - Type 2 7 kW
- [Pod Point Slough Borough Council - Herschel Street Car Park](https://ampmap.co.uk/charger/pod-point-slough-borough-council-herschel-street-car-park-uk) - Type 2 7 kW · Herschel Street Car Park, Herschel Street · From 50.4p/kWh
- [Herschel Multi-Storey Car Park · Total Energies](https://ampmap.co.uk/charger/total-energies-herschel-multi-storey-car-park-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Herschel Street
- [Pod Point Tesco Extra - Slough](https://ampmap.co.uk/charger/pod-point-tesco-extra-slough-uk) - CCS 50 kW, Type 2 7 kW · Brunel Way Wellington Street · From 44.4p/kWh
- [Chalvey Community Centre · Total Energies](https://ampmap.co.uk/charger/total-energies-chalvey-community-centre-uk) - Type 2 22 kW · The Green
- [HU - Slough Retail Park · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-slough-retail-park-uk) - CCS 120 kW, CHAdeMO 80 kW · Slough Retail Park · From 85p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargepoint-raw-charging-yard-the-urban-building-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Oct 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
