ChargePoint · EV charging site
RAW Greene King Bold Forester 1
Bold forester Botany avenue, Mansfield, NG18 5NE
RAW Greene King Bold Forester 1 is an EV charging site in Mansfield, Nottinghamshire, run by ChargePoint. Both of its sockets are 22 kW Type 2. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Portland Retail Park, Mansfield (Osprey Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Bold Forester 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Bold Forester 1 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates RAW Greene King Bold Forester 1?
RAW Greene King Bold Forester 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Bold Forester 1 (ChargePoint)?
Portland Retail Park, Mansfield (Osprey Charging) is 0.4 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Bold Forester 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Bold Forester 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Bold Forester 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Portland Retail Park, Mansfield
- Cowens Group
- Four Seasons Multi-Storey Car Park
- Pod Point Tesco Extra - Mansfield Chesterfield
- Toothill Lane Car Park
- Talbot Inn (Mansfield)
- Cheapest nearby
- Pod Point Tesco Extra - Mansfield Chesterfield · 49.2p per kWh · 22 kW · 0.7 mi
- Fastest nearby
- Portland Retail Park, Mansfield · 300 kW · 0.4 mi