ChargePoint · EV charging site
RAW Greene King Darleys 1
Darleys Pub & Restaurant 312 Boothferry Road, Kingston upon Hull, HU13 9AR
RAW Greene King Darleys 1 is an EV charging site in Kingston upon Hull, City of Kingston upon Hull, run by ChargePoint. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Wingfield Farm (Hessle) (evyve), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Darleys 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Darleys 1 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates RAW Greene King Darleys 1?
RAW Greene King Darleys 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Darleys 1 (ChargePoint)?
Wingfield Farm (Hessle) (evyve) is 0.9 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Darleys 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Darleys 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Darleys 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wingfield Farm (Hessle)
- Pod Point Aldi - Hessle
- IONITY GmbH IONITY Hull VH
- Nissan Trenton Hull
- Nissan Trenton
- McDonald's Hull
- Cheapest nearby
- Pod Point Aldi - Hessle · 25.2p per kWh · 7 kW · 1 mi
- Fastest nearby
- IONITY GmbH IONITY Hull VH · 400 kW · 1.3 mi