ChargePoint · EV charging site
RAW Greene King Kingstown 4
Kingstown Hotel Pub Hull Road, Kingston upon Hull, HU12 8DJ
RAW Greene King Kingstown 4 is an EV charging site in Kingston upon Hull, City of Kingston upon Hull, run by ChargePoint. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is EG GROUP HULL 2 (ChargePoint), 2.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Kingstown 4 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Kingstown 4 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates RAW Greene King Kingstown 4?
RAW Greene King Kingstown 4 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Kingstown 4 (ChargePoint)?
EG GROUP HULL 2 (ChargePoint) is 2.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Kingstown 4 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Kingstown 4 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Kingstown 4 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- EG Group Hull 2 · 150 kW · 2.7 mi