ChargePoint · EV charging site
RAW Greene King Lighthouse 2
7 Farndon Ave, Wallasey, CH45 3HA
RAW Greene King Lighthouse 2 is an EV charging site in Wallasey, Metropolitan Borough of Wirral, run by ChargePoint. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Nelson Hotel (Wallasey) (evyve), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Lighthouse 2 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Lighthouse 2 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates RAW Greene King Lighthouse 2?
RAW Greene King Lighthouse 2 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Lighthouse 2 (ChargePoint)?
Nelson Hotel (Wallasey) (evyve) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Lighthouse 2 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Lighthouse 2 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Lighthouse 2 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Nelson Hotel (Wallasey)
- o/s house 15 Alexandra Road, Wallasey
- Atherton Street, Wallasey (Opp house 21)
- O/S Nursing Home Atherton Street, New Brighton
- o/s house 3 Carrington Road, Wallasey
- Atherton Street, Wallasey (Opp Wellington Mansions)
- Cheapest nearby
- Nelson Hotel (Wallasey) · 85p per kWh · 75 kW · 0.2 mi
- Fastest nearby
- Nelson Hotel (Wallasey) · 75 kW · 0.2 mi