ChargePoint · EV charging site
Segro Areas Cambridge Est 4
Cambridge Industrial Estate Great Cambridge R, Ponders End, EN1 1SH
Segro Areas Cambridge Est 4 is an EV charging site in Ponders End, Greater London, run by ChargePoint. It has a single 43 kW Type 2 socket. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Great Cambridge Road (MFG EV Power), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Segro Areas Cambridge Est 4 (ChargePoint)?
Up to 43 kW DC via Type 2.
How many charging sockets does Segro Areas Cambridge Est 4 (ChargePoint) have?
1 charging socket: 1 × 43 kW Type 2.
Who operates Segro Areas Cambridge Est 4?
Segro Areas Cambridge Est 4 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to Segro Areas Cambridge Est 4 (ChargePoint)?
MFG Great Cambridge Road (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Segro Areas Cambridge Est 4 (ChargePoint)?
A typical 10–80% rapid charge takes about 81 min on the 43 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Segro Areas Cambridge Est 4 (ChargePoint)?
A typical 10–80% rapid charge takes about 59 min on the 43 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Segro Areas Cambridge Est 4 (ChargePoint)?
A typical 10–80% rapid charge takes about 76 min on the 43 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Segro Areas Cambridge Est 3
- MFG Great Cambridge Road
- Morrisons Enfield
- Morrisons Enfield
- ubitricity Distributed Energy Systems UK Ltd. 1D Main avenue
- Pod Point Tesco Extra - Enfield Ponders End
- Cheapest nearby
- Pod Point Tesco Extra - Enfield Ponders End · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- MFG Great Cambridge Road · 150 kW · 0.2 mi