ChargePoint · EV charging site
Sissinghurst Castle Garden - National Trust
Biddenden Road, Maidstone, TN17 2AB
Sissinghurst Castle Garden - National Trust is an EV charging site in Maidstone, Kent, run by ChargePoint. It has a single socket, with Type 2 at up to 22 kW. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Frankies Farm Shop (InstaVolt Ltd), 4.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Sissinghurst Castle Garden - National Trust (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Sissinghurst Castle Garden - National Trust (ChargePoint) have?
1 charging socket: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Sissinghurst Castle Garden - National Trust?
Sissinghurst Castle Garden - National Trust is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to Sissinghurst Castle Garden - National Trust (ChargePoint)?
Frankies Farm Shop (InstaVolt Ltd) is 4.7 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sissinghurst Castle Garden - National Trust (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sissinghurst Castle Garden - National Trust (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sissinghurst Castle Garden - National Trust (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.