# St Georges Retail Park · ChargePoint

Web page: https://ampmap.co.uk/charger/chargepoint-st-georges-retail-park-uk

St Georges Retail Park is an EV charging site in Leicester, City of Leicester, run by ChargePoint. All 12 of its sockets are 300 kW CCS.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** St George's Way, LE1 1SG
- **Area:** Leicester, City of Leicester, United Kingdom
- **Coordinates (latitude, longitude):** 52.63592, -1.12123

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 300 kW | 12 | Not listed |

- **Price:** £0.79/kWh; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** ChargePoint
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** branded as 'Raw Charging'

## Common questions

### How much does it cost to charge at St Georges Retail Park (ChargePoint)?

The listed price is £0.79/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at St Georges Retail Park (ChargePoint)?

Up to 300 kW DC via CCS.

### How many charging sockets does St Georges Retail Park (ChargePoint) have?

12 charging sockets: 12 × 300 kW CCS.

### Who operates St Georges Retail Park?

St Georges Retail Park is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

### How long does a Tesla Model Y Long Range take to charge at St Georges Retail Park (ChargePoint)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Georges Retail Park (ChargePoint)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at St Georges Retail Park (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Leicester](https://ampmap.co.uk/chargers/united-kingdom/city-of-leicester/leicester)
- [ChargePoint chargers](https://ampmap.co.uk/networks/chargepoint)

## Chargers near this site

- [Pod Point IBIS Leicester](https://ampmap.co.uk/charger/pod-point-ibis-leicester-uk) - Type 2 7 kW · St Georges Way Constitution Hill · From 25.2p/kWh
- [Pod Point BTR - UKPRS](https://ampmap.co.uk/charger/pod-point-btr-ukprs-3-uk) - Type 2 7 kW · 19A Queen Street · From 39.6p/kWh
- [Dover Street Car Park · Chargemaster](https://ampmap.co.uk/charger/chargemaster-dover-street-car-park-uk) - Type 2 7 kW · Dover Street Car Park
- [NCP Estate](https://ampmap.co.uk/charger/ncp-estate-4-uk) - Type 2 11 kW · Duke St
- [Leicester Community Sports Arena (Morningside Arena) · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-leicester-community-sports-arena-morningside-arena-uk) - CHAdeMO 50 kW, Type 2 50 kW · 31 Charter Street
- [Leicester Community Sports Arena · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-leicester-community-sports-arena-uk) - CCS 50 kW, CHAdeMO 50 kW · Charter Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargepoint-st-georges-retail-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Dec 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
