ChargePoint · EV charging site
Starbucks Stevenage
Whittle Way, Stevenage, SG1 2BE
Starbucks Stevenage is an EV charging site in Stevenage, Hertfordshire, run by ChargePoint. Its 4 sockets reach up to 150 kW, with CCS at the top speed. 17 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stevenage, UK (Tesla), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Starbucks Stevenage (ChargePoint)?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Starbucks Stevenage (ChargePoint) have?
4 charging sockets: 1 × 100 kW CHAdeMO, 1 × 100 kW CHAdeMO, 1 × 150 kW CCS, 1 × 150 kW CCS.
Who operates Starbucks Stevenage?
Starbucks Stevenage is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to Starbucks Stevenage (ChargePoint)?
Stevenage, UK (Tesla) is 0.2 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Starbucks Stevenage (ChargePoint)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Stevenage (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Starbucks Stevenage (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stevenage, UK
- eHGV - Stevenage Electric Forecourt
- Stevenage Electric Forecourt
- HU - Monkswood Retail Park
- Pod Point Tesco Superstore - Stevenage Broadwater
- Pod Point North Hertfordshire College
- Cheapest nearby
- Pod Point Tesco Superstore - Stevenage Broadwater · 44.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- eHGV - Stevenage Electric Forecourt · 400 kW · 0.2 mi