Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ChargePoint · EV charging site

Starbucks Stevenage

Whittle Way, Stevenage, SG1 2BE

Starbucks Stevenage is an EV charging site in Stevenage, Hertfordshire, run by ChargePoint. Its 4 sockets reach up to 150 kW, with CCS at the top speed. 17 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stevenage, UK (Tesla), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 27 Jun 2023Last verified 27 Jun 2023

Connectors

CCS · 150 kW2 connectors
CHAdeMO · 100 kW2 connectors

Site information

Operator
ChargePoint
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
1-408-841-4500

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Starbucks Stevenage (ChargePoint)?

Up to 150 kW DC via CHAdeMO, CCS.

How many charging sockets does Starbucks Stevenage (ChargePoint) have?

4 charging sockets: 1 × 100 kW CHAdeMO, 1 × 100 kW CHAdeMO, 1 × 150 kW CCS, 1 × 150 kW CCS.

Who operates Starbucks Stevenage?

Starbucks Stevenage is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

Where is the nearest other charger with 50 kW or more to Starbucks Stevenage (ChargePoint)?

Stevenage, UK (Tesla) is 0.2 miles away in a straight line, with up to 250 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbucks Stevenage (ChargePoint)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Stevenage (ChargePoint)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbucks Stevenage (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 27 Jun 2023

Amp Map does not take payment. You pay the operator.