ChargePoint · EV charging site
TECHNOCARGO0001 Denby 1
Hall Rd Denby Hall Business Park, Ripley, DE5 8JZ
TECHNOCARGO0001 Denby 1 is an EV charging site in Ripley, Derbyshire, run by ChargePoint. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Belper (GeniePoint), 3.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at TECHNOCARGO0001 Denby 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does TECHNOCARGO0001 Denby 1 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates TECHNOCARGO0001 Denby 1?
TECHNOCARGO0001 Denby 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to TECHNOCARGO0001 Denby 1 (ChargePoint)?
Morrisons Belper (GeniePoint) is 3.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at TECHNOCARGO0001 Denby 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at TECHNOCARGO0001 Denby 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at TECHNOCARGO0001 Denby 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ripley Hospital
- Shirley Road Car Park
- Pod Point Tesco Superstore - Heanor
- Coppice Car Park
- Field Lane Car Park
- Morrisons Belper
- Cheapest nearby
- Pod Point Tesco Superstore - Heanor · 44.4p per kWh · 7 kW · 2.5 mi
- Fastest nearby
- Morrisons Belper · 50 kW · 3.1 mi