EV charging site
City College Coventry
Bath Street Car Park, Coventry, CV1 5DG
City College Coventry is an EV charging site in Coventry. Both of its sockets are 7 kW Type 2. 72 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cox Street (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Near the exit barrier and security office. Restricted access to students, staff and visitors. Fitted under Midlands PiP
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at City College Coventry?
Up to 7 kW AC via Type 2.
How many charging sockets does City College Coventry have?
2 charging sockets: 2 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to City College Coventry?
Cox Street (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at City College Coventry?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at City College Coventry?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at City College Coventry?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Cox Street · 50 kW · 0.2 mi