City EV · EV charging site
Balfour Street, North Berwick
Balfour Street, North Berwick, EH394JY
Balfour Street, North Berwick is an EV charging site in North Berwick, East Lothian, run by City EV. It has a single 7 kW Type 2 socket. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Imperial Car Park Charging Hub, Fast Charger (Chargeplace Scotland), 160 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- City EV
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 23 9319 0109
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Balfour Street, North Berwick (City EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does Balfour Street, North Berwick (City EV) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Balfour Street, North Berwick?
Balfour Street, North Berwick is on the City EV network. For site issues, the operator lists +44 23 9319 0109.
Where is the nearest charger with 50 kW or more to Balfour Street, North Berwick (City EV)?
Imperial Car Park Charging Hub, Fast Charger (Chargeplace Scotland) is 160 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Balfour Street, North Berwick (City EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Balfour Street, North Berwick (City EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Balfour Street, North Berwick (City EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Imperial Car Park Charging Hub, Fast Charger
- Dundas Road, North Berwick
- North Berwick Sports Centre
- North Berwick Railway Station, North Berwick
- Pod Point Tesco Superstore - North Berwick
- Links Road, North Berwick
- Cheapest nearby
- Pod Point Tesco Superstore - North Berwick · 44.4p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- Imperial Car Park Charging Hub, Fast Charger · 50 kW · 160 yd