City EV · EV charging site
Lamp Column 7, Maresfield Road
Maresfield Road, Brighton, BN2 5ES
Lamp Column 7, Maresfield Road is an EV charging site in Brighton, Brighton and Hove, run by City EV. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 52 other charging sites are listed within a mile, and the nearest site with 50 kW or more is University Way SF Connect (BP Pulse), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- City EV
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 24 May 2019)
- Phone (from Open Charge Map)
- +44 23 9319 0109
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lamp Column 7, Maresfield Road (City EV)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Lamp Column 7, Maresfield Road (City EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does Lamp Column 7, Maresfield Road (City EV) have?
2 charging sockets: 1 × 4 kW Type 2, 1 × 7 kW Type 2.
Who operates Lamp Column 7, Maresfield Road?
Lamp Column 7, Maresfield Road is on the City EV network. For site issues, the operator lists +44 23 9319 0109.
Where is the nearest charger with 50 kW or more to Lamp Column 7, Maresfield Road (City EV)?
University Way SF Connect (BP Pulse) is 1.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lamp Column 7, Maresfield Road (City EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lamp Column 7, Maresfield Road (City EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lamp Column 7, Maresfield Road (City EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 05707 Maresfield Road
- 05845 Bristol Street
- 05912 Craven Road
- MSCP Royal Sussex County Hospital 3
- Walpole Terrace, Sign 502
- 05858 Tilgate Close
- Fastest nearby
- MSCP Royal Sussex County Hospital 3 · 22 kW · 0.3 mi