# Lamp column at side of 80 Staunton Road · City EV

Web page: https://ampmap.co.uk/charger/city-ev-lamp-column-at-side-of-80-staunton-road-uk

Lamp column at side of 80 Staunton Road is an EV charging site in Surbiton, Greater London, run by City EV. It has a single 6 kW Type 2 socket, and the price is listed as £0.24/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Staunton Road, KT2 5TL
- **Area:** Surbiton, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.42191, -0.29758

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 6 kW | 1 | Not listed |

- **Price:** £0.24/kWh (from Open Charge Map)

## Site information

- **Operator:** City EV
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Lamp column at side of 80 Staunton Road (City EV)?

The listed price is £0.24/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Lamp column at side of 80 Staunton Road (City EV)?

Up to 6 kW AC via Type 2.

### How many charging sockets does Lamp column at side of 80 Staunton Road (City EV) have?

1 charging socket: 1 × 6 kW Type 2.

### Who operates Lamp column at side of 80 Staunton Road?

Lamp column at side of 80 Staunton Road is on the City EV network. For site issues, the operator lists +44 23 9319 0109.

### How long does a Tesla Model Y Long Range take to charge at Lamp column at side of 80 Staunton Road (City EV)?

A 10–80% charge takes about 9h 13m on the 6 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lamp column at side of 80 Staunton Road (City EV)?

A 10–80% charge takes about 6h 39m on the 6 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Lamp column at side of 80 Staunton Road (City EV)?

A 10–80% charge takes about 8h 31m on the 6 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Surbiton](https://ampmap.co.uk/chargers/united-kingdom/greater-london/surbiton)
- [Cheapest charging in Surbiton](https://ampmap.co.uk/chargers/united-kingdom/greater-london/surbiton/cheapest)
- [City EV chargers](https://ampmap.co.uk/networks/city-ev)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. Road Staunton, O S Public House](https://ampmap.co.uk/charger/ubitricity-road-staunton-o-s-public-house-uk) - Ubitricity · Type 2 5 kW · Road Staunton, O S Public House · From 45p/kWh
- [Staunton Road · SureCharge](https://ampmap.co.uk/charger/surecharge-staunton-road-uk) - Type 2 5 kW · Staunton Road
- [ubitricity Distributed Energy Systems UK Ltd. 62 Staunton Road, Outside 62](https://ampmap.co.uk/charger/ubitricity-62-staunton-road-outside-62-uk) - Ubitricity · Type 2 5 kW · 62 Staunton Road, Outside 62 · From 45p/kWh
- [Studland Road · SureCharge](https://ampmap.co.uk/charger/surecharge-studland-road-uk) - Type 2 5 kW · Studland Road
- [ubitricity Distributed Energy Systems UK Ltd. 48 Studland Road, Side Of 48 Durlston Road](https://ampmap.co.uk/charger/ubitricity-48-studland-road-side-of-48-durlston-road-uk) - Ubitricity · Type 2 5 kW · 48 Studland Road, Side Of 48 Durlston Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 108 St Albans Road, Side Of 108 Durlston Road](https://ampmap.co.uk/charger/ubitricity-108-st-albans-road-side-of-108-durlston-road-uk) - Ubitricity · Type 2 5 kW · 108 St Albans Road, Side Of 108 Durlston Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/city-ev-lamp-column-at-side-of-80-staunton-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 Sept 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
