City EV · EV charging site
o/s house 21 The Summit, Wallasey
o/s house 21 The Summit, Wallasey, CH44 1AZ
o/s house 21 The Summit, Wallasey is an EV charging site in Wallasey, Metropolitan Borough of Wirral, run by City EV. It has a single 7 kW Type 2 socket. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Nelson Hotel (Wallasey) (evyve), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- City EV
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 23 9319 0109
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at o/s house 21 The Summit, Wallasey (City EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does o/s house 21 The Summit, Wallasey (City EV) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates o/s house 21 The Summit, Wallasey?
o/s house 21 The Summit, Wallasey is on the City EV network. For site issues, the operator lists +44 23 9319 0109.
Where is the nearest charger with 50 kW or more to o/s house 21 The Summit, Wallasey (City EV)?
Nelson Hotel (Wallasey) (evyve) is 1.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at o/s house 21 The Summit, Wallasey (City EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at o/s house 21 The Summit, Wallasey (City EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at o/s house 21 The Summit, Wallasey (City EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.