Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Clenergy · EV charging site

Alderton Road

7 Alderton Road, Brixton, SE24 0AX

Alderton Road is an EV charging site in Brixton, Greater London, run by Clenergy. It has a single 3 kW Type 2 socket. 312 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 1-25 Tulse Hill, Brixton (Monta), 0.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 10 Nov 2024Last verified 10 Nov 2024

Connectors

Type 2 · 3 kW1 connector

Site information

Operator
Clenergy
Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Alderton Road (Clenergy)?

Up to 3 kW AC via Type 2.

How many charging sockets does Alderton Road (Clenergy) have?

1 charging socket: 1 × 3 kW Type 2.

Who operates Alderton Road?

Alderton Road is on the Clenergy network.

Where is the nearest charger with 50 kW or more to Alderton Road (Clenergy)?

1-25 Tulse Hill, Brixton (Monta) is 0.8 miles away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Alderton Road (Clenergy)?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Alderton Road (Clenergy)?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Alderton Road (Clenergy)?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 10 Nov 2024

Amp Map does not take payment. You pay the operator.