Clenergy · EV charging site
Down to Earth Project (Murton Site)
72a Manselfield Road, Swansea, SA3 3AP
Down to Earth Project (Murton Site) is an EV charging site in Swansea, City and County of Swansea, run by Clenergy. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as DC: £0.60/kWh, AC: £0.40/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Beaufort Arms, Gower (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Clenergy
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- DC: £0.60/kWh, AC: £0.40/kWh(from Open Charge Map, 17 Jan 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Down to Earth Project (Murton Site) (Clenergy)?
The listed price is DC: £0.60/kWh, AC: £0.40/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Down to Earth Project (Murton Site) (Clenergy)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Down to Earth Project (Murton Site) (Clenergy) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Down to Earth Project (Murton Site)?
Down to Earth Project (Murton Site) is on the Clenergy network.
Where is the nearest other charger with 50 kW or more to Down to Earth Project (Murton Site) (Clenergy)?
Beaufort Arms, Gower (Osprey Charging) is 1.1 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Down to Earth Project (Murton Site) (Clenergy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Down to Earth Project (Murton Site) (Clenergy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Down to Earth Project (Murton Site) (Clenergy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Down to Earth
- Caswell Bay Car Park
- Langland Bay Beach Car Park
- Beaufort Arms, Gower
- Clyne GC
- Knab Rock Car Park
- Cheapest nearby
- Beaufort Arms, Gower · 89p per kWh · 60 kW · 1.1 mi
- Fastest nearby
- Beaufort Arms, Gower · 60 kW · 1.1 mi