# Down to Earth Project (Murton Site) · Clenergy

Web page: https://ampmap.co.uk/charger/clenergy-down-to-earth-project-murton-site-uk

Down to Earth Project (Murton Site) is an EV charging site in Swansea, City and County of Swansea, run by Clenergy. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as DC: £0.60/kWh, AC: £0.40/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 72a Manselfield Road, SA3 3AP
- **Area:** Swansea, City and County of Swansea, United Kingdom
- **Coordinates (latitude, longitude):** 51.57944, -4.03518

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** DC: £0.60/kWh, AC: £0.40/kWh (from Open Charge Map)

## Site information

- **Operator:** Clenergy
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Down to Earth Project (Murton Site) (Clenergy)?

The listed price is DC: £0.60/kWh, AC: £0.40/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Down to Earth Project (Murton Site) (Clenergy)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Down to Earth Project (Murton Site) (Clenergy) have?

3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Down to Earth Project (Murton Site)?

Down to Earth Project (Murton Site) is on the Clenergy network.

### How long does a Tesla Model Y Long Range take to charge at Down to Earth Project (Murton Site) (Clenergy)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Down to Earth Project (Murton Site) (Clenergy)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Down to Earth Project (Murton Site) (Clenergy)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Swansea](https://ampmap.co.uk/chargers/united-kingdom/city-and-county-of-swansea/swansea)
- [Clenergy chargers](https://ampmap.co.uk/networks/clenergy)

## Chargers near this site

- [Down to Earth · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-down-to-earth-uk) - Type 2 7 kW · 72a Manselfield Road
- [Caswell Bay Car Park · Clenergy](https://ampmap.co.uk/charger/clenergy-caswell-bay-car-park-uk) - Type 2 22 kW · Caswell Road
- [Langland Bay Beach Car Park · Clenergy](https://ampmap.co.uk/charger/clenergy-langland-bay-beach-car-park-uk) - Type 2 22 kW · Langland Bay Road
- [Beaufort Arms, Gower · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-beaufort-arms-uk) - CCS 60 kW, CHAdeMO 50 kW · 18 Pennard Road · From 89p/kWh
- [Clyne GC](https://ampmap.co.uk/charger/monta-aps-clyne-gc-m-uk) - Type 2 7 kW · Clyne Golf Club
- [Knab Rock Car Park · Clenergy](https://ampmap.co.uk/charger/clenergy-knab-rock-car-park-uk) - Type 2 22 kW · Mumbles Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/clenergy-down-to-earth-project-murton-site-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 17 Jan 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
