# Nant y Ci P & R · Clenergy

Web page: https://ampmap.co.uk/charger/clenergy-nant-y-ci-p-and-r-uk

Nant y Ci P & R is an EV charging site in Carmarthen, Carmarthenshire, run by Clenergy. Both of its sockets are 22 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Llysonnen Road, SA33 5DR
- **Area:** Carmarthen, Carmarthenshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.84681, -4.35260

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

## Site information

- **Operator:** Clenergy
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Nant y Ci P & R (Clenergy)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Nant y Ci P & R (Clenergy) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Nant y Ci P & R?

Nant y Ci P & R is on the Clenergy network.

### How long does a Tesla Model Y Long Range take to charge at Nant y Ci P & R (Clenergy)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nant y Ci P & R (Clenergy)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Nant y Ci P & R (Clenergy)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Carmarthen](https://ampmap.co.uk/chargers/united-kingdom/carmarthenshire/carmarthen)
- [Clenergy chargers](https://ampmap.co.uk/networks/clenergy)

## Chargers near this site

- [Nant y Ci Park and Ride](https://ampmap.co.uk/charger/nant-y-ci-park-and-ride-uk) - CCS 50 kW, CHAdeMO 50 kW · Nant-y-Ci
- [Tenby Road Filling Station & Cafe · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-tenby-road-filling-station-and-cafe-uk) - CCS 62 kW, CHAdeMO 50 kW · A40(T) Carmarthen To St Clears (Eastbound)
- [Xcel Bowl, Llansteffan Road, · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-xcel-bowl-llansteffan-road-uk) - Type 2 22 kW · Llansteffan Road
- [Xcel Bowl · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-xcel-bowl-uk) - Type 2 22 kW · Old Llansteffan Road
- [Pod Point UWTSD - Carmarthen Campus](https://ampmap.co.uk/charger/pod-point-uwtsd-carmarthen-campus-uk) - Type 2 7 kW · Carmarthen Campus, College Road · From 34.8p/kWh
- [Carmarthen Leisure Centre · Clenergy](https://ampmap.co.uk/charger/clenergy-carmarthen-leisure-centre-uk) - Type 2 22 kW · Llansteffan Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/clenergy-nant-y-ci-p-and-r-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
