Clenergy · EV charging site
Pembrey Country Park
Pembrey Beach & Country Park, Llanelli, SA16 0EJ
Pembrey Country Park is an EV charging site at Pembrey Beach & Country Park in Llanelli, Carmarthenshire, run by Clenergy. Both of its sockets are 22 kW Type 2. Amp Map lists 1 other charge point named Pembrey Country Park in Llanelli. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Pentre Awel, 6.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Clenergy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Pembrey Country Park (Clenergy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Pembrey Country Park (Clenergy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Pembrey Country Park?
Pembrey Country Park is on the Clenergy network.
Where is the nearest charger with 50 kW or more to Pembrey Country Park (Clenergy)?
Pentre Awel is 6.5 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pembrey Country Park (Clenergy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pembrey Country Park (Clenergy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pembrey Country Park (Clenergy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.