# Queens Avenue · Clenergy

Web page: https://ampmap.co.uk/charger/clenergy-queens-avenue-uk

Queens Avenue is an EV charging site in Canterbury, Kent, run by Clenergy. Both of its sockets are 7 kW Type 2, and the price is listed as £0.60/kWh (Feb 2025).

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Queens Avenue, CT2 8AY
- **Area:** Canterbury, Kent, United Kingdom
- **Coordinates (latitude, longitude):** 51.28154, 1.07043

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** £0.60/kWh (Feb 2025) (from Open Charge Map)

## Site information

- **Operator:** Clenergy
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Scan QR code to pay or use their app/a supported RFID. Free parking for 4 hours.

## Common questions

### How much does it cost to charge at Queens Avenue (Clenergy)?

The listed price is £0.60/kWh (Feb 2025). Prices can change, so check the price at the charger before you start.

### How fast is charging at Queens Avenue (Clenergy)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Queens Avenue (Clenergy) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Queens Avenue?

Queens Avenue is on the Clenergy network. For site issues, the operator lists 03330129095.

### How long does a Tesla Model Y Long Range take to charge at Queens Avenue (Clenergy)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queens Avenue (Clenergy)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Queens Avenue (Clenergy)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Canterbury](https://ampmap.co.uk/chargers/united-kingdom/kent/canterbury)
- [Clenergy chargers](https://ampmap.co.uk/networks/clenergy)

## Chargers near this site

- [Roper Yard](https://ampmap.co.uk/charger/roper-yard-uk) - Type 2 7 kW · 20 Roper Road
- [Multi-Storey Car Park · EV Dot](https://ampmap.co.uk/charger/ev-dot-multi-storey-car-park-uk) - Type 2 22 kW · Station Road West
- [Westgate Hall Road · Incharge (SE)](https://ampmap.co.uk/charger/incharge-westgate-hall-road-uk) - Type 2 22 kW · Westgate Hall Road
- [Beverley Road · Incharge (SE)](https://ampmap.co.uk/charger/incharge-beverley-road-uk) - Type 2 22 kW · Beverley Road
- [Castle Row Car Park · EV Dot](https://ampmap.co.uk/charger/ev-dot-castle-row-car-park-uk) - Type 2 22 kW · Castle Street
- [Ev Dot Watling Street Car Park](https://ampmap.co.uk/charger/ev-dot-watling-street-car-park-uk) - EV Dot · Type 2 22 kW · Watling Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/clenergy-queens-avenue-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 Feb 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
