Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Clenergy · EV charging site

ClenergyEv Carew Street

Carew Street, Brixton, SE5 9DF

ClenergyEv Carew Street is an EV charging site in Brixton, Greater London, run by Clenergy. It has a single 3 kW Type 2 socket. 295 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Morant House (BP Pulse), 0.9 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 27 Mar 2025Last verified 27 Mar 2025

Connectors

Type 2 · 3 kW1 connector

Site information

Operator
Clenergy
Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at ClenergyEv Carew Street?

Up to 3 kW AC via Type 2.

How many charging sockets does ClenergyEv Carew Street have?

1 charging socket: 1 × 3 kW Type 2.

Who operates ClenergyEv Carew Street?

ClenergyEv Carew Street is on the Clenergy network.

Where is the nearest charger with 50 kW or more to ClenergyEv Carew Street?

[E-TAXI ONLY] Morant House (BP Pulse) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at ClenergyEv Carew Street?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ClenergyEv Carew Street?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at ClenergyEv Carew Street?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 27 Mar 2025

Amp Map does not take payment. You pay the operator.