EV charging site
Cleveland Way Car Park
Cleveland Way, Helmsley, YO62 5AZ
Cleveland Way Car Park is an EV charging site in Helmsley, North Yorkshire. It has a single 22 kW Type 2 socket, and the price is listed as 25p per kW via APP or RFID card. No other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG Thirsk (MFG EV Power), 10.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- 25p per kW via APP or RFID card(from Open Charge Map, 28 Aug 2021)
- Phone (from Open Charge Map)
- 0800 029 1696
- Notes
- Restroom facilities 10 yards away
- Getting there
- parking fees apply while charging
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cleveland Way Car Park?
The listed price is 25p per kW via APP or RFID card. Prices can change, so check the price at the charger before you start.
How fast is charging at Cleveland Way Car Park?
Up to 22 kW AC via Type 2.
How many charging sockets does Cleveland Way Car Park have?
1 charging socket: 4 × 22 kW Type 2.
Where is the nearest charger with 50 kW or more to Cleveland Way Car Park?
MFG Thirsk (MFG EV Power) is 10.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cleveland Way Car Park?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cleveland Way Car Park?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cleveland Way Car Park?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.