EV charging site
Coed Cae B&B
Coed Cae, Dolgellau, LL40 2TU
Coed Cae B&B is an EV charging site in Dolgellau, Gwynedd. Both of its sockets are 4 kW Type 2, and the price is listed as £0.30/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Marian Mawr CP Dolgellau (Evolt), 2.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- £0.30/kWh(from Open Charge Map, 8 May 2019)
- Phone (from Open Charge Map)
- 01341430628
- Notes
- IEC 62196 (Type 2) charging sockets
- Getting there
- Access is provided for customers of the B&B and bike rental service
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Coed Cae B&B?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Coed Cae B&B?
Up to 4 kW AC via Type 2.
How many charging sockets does Coed Cae B&B have?
2 charging sockets: 2 × 4 kW Type 2.
Can anyone charge at Coed Cae B&B?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Coed Cae B&B?
Marian Mawr CP Dolgellau (Evolt) is 2.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Coed Cae B&B?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Coed Cae B&B?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Coed Cae B&B?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Marian Mawr CP Dolgellau · 50 kW · 2.4 mi