# Albion Road Car Park · Connected Kerb

Web page: https://ampmap.co.uk/charger/connected-kerb-albion-road-car-park-uk

Albion Road Car Park is an EV charging site in Scarborough, North Yorkshire, run by Connected Kerb. Its 8 sockets reach up to 22 kW, with Type 2 at the top speed, and the price is listed as 50p per kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Area:** Scarborough, North Yorkshire, United Kingdom
- **Coordinates (latitude, longitude):** 54.27536, -0.40026

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed |
| Type 2 | 7 kW | 4 | Not listed |

- **Price:** 50p per kW (from Open Charge Map)

## Site information

- **Operator:** Connected Kerb
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Paying Fee's Apply Untill 6pm

## Common questions

### How much does it cost to charge at Albion Road Car Park (Connected Kerb)?

The listed price is 50p per kW. Prices can change, so check the price at the charger before you start.

### How fast is charging at Albion Road Car Park (Connected Kerb)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Albion Road Car Park (Connected Kerb) have?

8 charging sockets: 2 × 7 kW Type 2, 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 7 kW Type 2.

### Who operates Albion Road Car Park?

Albion Road Car Park is on the Connected Kerb network.

### How long does a Tesla Model Y Long Range take to charge at Albion Road Car Park (Connected Kerb)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Albion Road Car Park (Connected Kerb)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Albion Road Car Park (Connected Kerb)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Scarborough](https://ampmap.co.uk/chargers/united-kingdom/north-yorkshire/scarborough)
- [Connected Kerb chargers](https://ampmap.co.uk/networks/connected-kerb)

## Chargers near this site

- [Crown Hotel Scarborough · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-crown-hotel-scarborough-uk) - Blue Commando (2P+E) 4 kW · Esplanade
- [Pod Point Tesco Superstore - Scarborough](https://ampmap.co.uk/charger/pod-point-tesco-superstore-scarborough-uk) - Type 2 7 kW · Westwood · From 44.4p/kWh
- [Pavilion Car Park · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-pavilion-car-park-uk) - CCS 120 kW · Valley Bridge Road
- [Brunswick Shopping Centre](https://ampmap.co.uk/charger/brunswick-shopping-centre-uk) - Type 2 7 kW · York Place
- [St Thomas Street Car Park · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-st-thomas-street-car-park-uk) - Type 2 7 kW · 19 St Thomas St
- [North Street Car Park · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-north-street-car-park-uk) - Type 2 22 kW, Type 2 7 kW · 6 North St

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/connected-kerb-albion-road-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 11 Nov 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
