Connected Kerb · EV charging site
Bargoed Railway Station, Car Park 1, Caerphilly
Bargoed Railway Station, Car Park 1, Blackwood, CF81 9AL
Bargoed Railway Station, Car Park 1, Caerphilly is an EV charging site in Blackwood, Caerphilly County Borough, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Otter, Newbridge (Osprey Charging), 4.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Bargoed Railway Station, Car Park 1, Caerphilly (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bargoed Railway Station, Car Park 1, Caerphilly (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Bargoed Railway Station, Car Park 1, Caerphilly?
Bargoed Railway Station, Car Park 1, Caerphilly is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Bargoed Railway Station, Car Park 1, Caerphilly (Connected Kerb)?
Otter, Newbridge (Osprey Charging) is 4.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bargoed Railway Station, Car Park 1, Caerphilly (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bargoed Railway Station, Car Park 1, Caerphilly (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bargoed Railway Station, Car Park 1, Caerphilly (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hanbury Road Car Park, Caerphilly
- Pengam Railway Station Car Park 1, Caerphilly
- Dyffryn Terrace Car Park
- Market Trader Car Park
- Trelewis, Bontnewydd Terrace
- Dynevor Terrace Car Park
- Fastest nearby
- Hanbury Road Car Park, Caerphilly · 22 kW · 0.2 mi