Connected Kerb · EV charging site
Barras Lane 1
Barras Lane, Coventry, CV1 3BU
Barras Lane 1 is an EV charging site in Coventry, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 99 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lower Holyhead Road (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Barras Lane 1 (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Barras Lane 1 (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Barras Lane 1?
Barras Lane 1 is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Barras Lane 1 (Connected Kerb)?
Lower Holyhead Road (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Barras Lane 1 (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Barras Lane 1 (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Barras Lane 1 (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.